Scheme :: Construction of CHECK Dams (In-Stream Storage structure)

Introduction to the scheme

Government of Odisha launched the scheme in 2010-11 to construct Check dams/In-stream storage structures in small rivers, streams and anicuts in major rivers and streams to utilize a part of surface runoff flowing down the sea. The objective is to conserve water at end of monsoon to meet following requirements.

  • to provide drinking water facilities in the villages along both the sides of river after monsoon period.
  • to provide incidental irrigation to crops during late khariff and rabi by storing water at the end of monsoon, mainly through lifting devices. 
  • Irrigation use of water flowing down drainage channels.
  • to divert water from perennial / semi-perennial streams in hilly areas for irrigation purpose.
  • to recharge ground water.
  • Other uses by villagers like bathing, washing, fishing, recreation etc. depending on location and potentiality.
Kandhomal Kandhomal Kandhomal Balasore Narasinghpur Nilgiri Dhenkanal Badajore nalla Check Dam (DS) in Gondia Block Dhenkanal Ghodadian nalla Check Dam in Parjanga block Kalahandi Gobarpali Nalla M Rampur Kalahandi Pandkamal M Rampur Rayagada Barhamaribhata Check dam in Kasipur Block

To involve beneficiaries during execution of the project, Pani Panchayat (WUAs) would be formed during the process of selection of site for a check dam. The infrastructure, once completed in all respect, would be handed over to Pani Panchayats for operation and maintenance. However, technical assistance required for operation and maintenance would be extended free of cost by the department. 

 
Site selection priorities

go to Top

  • in blocks having less than 35% irrigation coverage.

  • where people are using traditional method of irrigation by constructing temporary cross bunds on streams.

  • where the beneficiaries are willing to take up operation and maintenance of the structure.

  • where the newly constructed structure does not have any adverse impact on the hydrological efficacy of the existing, ongoing and proposed major, medium and minor (flow) irrigation and minor (lift) irrigation projects.

  • In-stream storage will be developed near urban centers, if suitable rivers and locations available for multipurpose domestic and irrigation use.

Funding arrangement

 
  • KBK districts :: State Fund, Special Component Assistance (SCA), Additional Central Assistance (ACA)
     

  • NonKBK districts :: State fund

Citizen Charter
 

Download Guidelines for construction of Check Dams

Download Application Form

List of Nodal Officers

Procedure for Selection, Design and Construction of Check Dams

go to Top

Status of the Scheme
 

Year-wise Budget provision and expenditure incurred (Unit: Rs. in Cr)

Year Major & Medium Sector Minor (Flow) Sector Total
Original
Budget
Revised
Budget
Expr.
Original
Budget
Revised
Budget
Expr.
Original
Budget
Revised
Budget
Expr.
2010-11 20.00 9.90 9.90 80.00 80.03 30.20 100.00 89.93 40.10
2011-12 25.00 14.43 14.43 175.00 114.62 107.02 200.00 129.05 121.45
2012-13 25.00 19.72 16.73 191.14 230.31 216.33 216.14 250.03 233.06
2013-14 25.00 21.80 16.53 241.14 222.78 206.94 266.14 244.58 223.47
2014-15 25.00 29.74 26.48 244.00 324.97 324.94 269.00 354.71 351.42
2015-16 20.00 24.48 24.48 212.00 402.5 413.44 232.00 426.98 437.92
2016-17* 35.00   12.96 389.00   236.95 424   249.91
* by end of Qtr1

Physical progress of construction of Check Dams (Unit: Nos)
Year Major & Medium Sector Minor (Flow) Sector Total
Programmed Completed Programmed Completed Programmed Completed
2010-11 171 167** 1000 413 1171 580
2011-12 106 102 3000 1133 3106 1235
2012-13 125 115 3000 1848 3125 1963
2013-14 110 89 6000 913 6110 1002
2014-15 170 146 2000 1619 2170 1765
 2015-16 546 154 2000 1527 2546 1681
2016-17* 510 65 4000 506 4510 571
* by end of Qtr1(figures are provisional)          ** The above figure includes 4 nos. of check dams completed through PP Scheme in Keonjhar Dist. in the FY 2010-11